Since 2014, almost every rural home in India got a wire, a pipe, a toilet, a gas cylinder and a bank account. This report puts every sector on one 0–100 scale and asks a harder question: how much of it actually works every day?

One example: drinking water, rural homes
Have a tap at home82%
Tap water arrives on schedule~69%
Enough, regular and safe~62%
82% × survey rates (84% on schedule, 76% fully working). Our estimate from Jal Jeevan Mission data, Aug 2026 and 2024 survey.
The gap

Every sector, two bars

Blue is how many are connected. Orange is how many it actually works for. The black tick shows where the blue bar started. Under each sector, a line explains why the two bars differ. Biggest gaps first.

Connected now Working or used Starting point (2014, or the scheme's start) Our estimate

Bars are shares of homes, people or route length, each described under the sector name. "Gap" is blue minus orange, in percentage points. LPG coverage is officially 107% (more connections than homes), shown here capped at 100%.

The other column

Where it went the wrong way

Not everything moved up. These are the numbers a scoreboard of new connections leaves out.

840→741 cr

Train journeys a year

Still below 2013–14. Suburban and unreserved travel never fully came back after COVID.

93.6→~98.5

Railway operating ratio

Rupees spent to earn ₹100. Near 100 leaves almost nothing of its own to invest. Approximate.

9→4

Subsidised gas refills a year

Ujjwala's cap was cut in 2026, just as a West Asia supply shock pushed cylinder costs up.

₹1.2 lakh

Rural house grant, frozen

Unchanged since 2016 while building costs rose. Many families borrow to finish.

~1.7 lakh

Road deaths a year

Faster highways have not made India's roads safer. Among the highest tolls anywhere.

1 in 3

Bank accounts unused

Findex 2021: about a third of account holders made no deposit or withdrawal in a year.